PA N
o
BPRJ.CAP.1269 – CPoA
1
PROJECT ARRANGEMENT N° B PRJ.CAP.1269
between
THE FEDERAL MINISTER OF DEFENCE OF THE REPUBLIC OF AUSTRIA
THE MINISTER OF DEFENCE OF THE KINGDOM OF BELGIUM
THE MINISTRY OF DEFENCE OF THE REPUBLIC OF BULGARIA
THE MINISTRY OF DEFENCE OF THE REPUBLIC OF CROATIA
THE MINISTRY OF DEFENCE OF THE REPUBLIC OF CYPRUS
THE MINISTRY OF DEFENCE OF THE CZECH REPUBLIC
THE MINISTRY OF DEFENCE OF ESTONIA
THE MINISTRY OF DEFENCE OF THE REPUBLIC OF FINLAND
THE MINISTER OF DEFENCE OF THE FRENCH REPUBLIC
THE FEDERAL MINISTRY OF DEFENCE OF THE FEDERAL REPUBLIC OF GERMANY
THE MINISTRY OF NATIONAL DEFENCE OF THE HELLENIC REPUBLIC
THE MINISTER OF DEFENCE OF HUNGARY
THE MINISTER FOR DEFENCE IRELAND
THE MINISTRY OF DEFENCE OF THE ITALIAN REPUBLIC
THE MINISTRY OF DEFENCE OF THE REPUBLIC OF LATVIA
THE MINISTRY OF NATIONAL DEFENCE OF THE REPUBLIC OF LITHUANIA
THE MINISTER OF DEFENCE OF THE GRAND DUCHY OF LUXEMBOURG
THE MINISTRY RESPONSIBLE FOR DEFENCE OF THE REPUBLIC OF MALTA
THE MINISTER OF DEFENCE OF THE KINGDOM OF THE NETHERLANDS
THE MINISTRY OF DEFENCE IN NORWAY
THE MINISTER OF NATIONAL DEFENCE OF THE REPUBLIC OF POLAND
THE MINISTRY OF NATIONAL DEFENCE OF THE PORTUGUESE REPUBLIC
THE MINISTRY OF NATIONAL DEFENCE OF ROMANIA
THE MINISTRY OF DEFENCE OF THE SLOVAK REPUBLIC
THE MINISTRY OF DEFENCE OF THE REPUBLIC OF SLOVENIA
THE MINISTER OF DEFENCE OF THE KINGDOM OF SPAIN
FÖRSVARETS MATERIELVERK OF THE KINGDOM OF SWEDEN
Hereinafter referred to as “the contributing Members”
and THE EUROPEAN DEFENCE AGENCY
Hereinafter referred to collectively as “the Participants”
Relating to
PA
N
o
BPRJ.CAP.1269 – CPoA
2
COLLABORATIVE PROCUREMENT OF AMMUNITION (CPoA)
DEFINITION AND ABREVIATIONS
Cat. B Project
An Ad-Hoc Category B Project as defined in Article 20 of the Council
Decision (CFSP) 2015/1835
Ad Hoc Bank Account
A deposit account with the EDA bank that is specifically dedicated to
holding the funds and management of financial transactions related to the
Project
cM(s) contributing Member(s) to the Project
CPoA Collaborative Procurement of Ammunition
CWS Collaborative Workspaces
EDA European Defence Agency
EDA Collaborative
Platform (ECP)
Ad Hoc platform for EDA related Projects information sharing.
EDA PO EDA Project Officer for the CPoA Project
EDA Steering Board
EDA Steering Board established under Article 8 of the Council Decision
(CFSP) 2015/1835
EDIP European Defence Investment Programme
EDIRPA
European Defence Industry Reinforcement through Common Procurement
Act
EPF European Peace Facility
EU European Union
FWA Framework Agreement
OF
Order Form
A contract under a specific Framework Agreement, containing the quantities
from all Written Orders.
Ordering Entities (OE) Any cMs and EDA placing WOs
PA
N
o
BPRJ.CAP.1269 – CPoA
3
PA Project Arrangement
PAMG Project Arrangement Management Group
Participants PA Participants (all cM(s) and EDA)
Project Collaborative Procurement of Ammunition (CPoA) N° B PRJ.CAP.1269
PWG Project Working Group
pMS EU Member States who participate in EDA
PoC Point of Contact
ToR Terms of Reference
VAT Value Added Tax
WO
Written Order
A written request for ordering a specific quantity of ammunition under a
specific Framework Agreement.
PA
N
o
BPRJ.CAP.1269 – CPoA
4
1. Introduction
The contributing Members (cMs) considering:
- The Treaty on European Union tasking the European Defence Agency
(hereinafter referred to as “EDA”),
inter alia, to promote harmonisation of operational needs and
adoption of effective, compatible
procurement methods (Articles 45 paragraph 1b TEU);
- Protocol (No. 7) on the privileges and immunities of the European Union,
annexed to the Treaty on
European Union and to the Treaty on the Functioning of the European Union, and
made applicable to
EDA by Article 27.3 of the Council Decision;
- Council Decision (CFSP) 2015/1835 of 12 October 2015 defining the statute,
seat and operational rules
of the European Defence Agency (hereinafter referred to as “the Council
Decision”) tasks the EDA to
promote and enhance European cooperation, in particular, to promote
cost-effective and efficient
procurement by identifying and disseminating best practices and
implement any measure needed to
strengthen the industrial and technological base of the defence sector .
Moreover, it contains clear rules on
how to launch cooperative ad-hoc projects or Projects of groups of Member
States and on how to entrust
the EDA with the management of such projects or Projects (Article 17 and
Chapter IV);
- Council Decision (EU) 2016/1353 of 4 August 2016 concerning the
financial rules of the European
Defence Agency (hereinafter referred to as “EDA’s Financial Rules”), and in
particular Art. 34 jointly
read with recital 23 of the preamble of Directive 2009/81/EC of the European
Parliament and the Council
of 13 July 2009 on the coordination of procedures for the award of certain works
contracts, supply
contracts and service contracts by contracting authorities or entities in the
fields of defence and security,
and amending Directives 2004/17/EC and 2004/18/EC, OJ. L 216/76;
- that the EDA Steering Board has been duly informed on 20 January 2023 by
participating Member States
(pMS) that they intended to establish an Ad hoc Category B Project within the
EDA’s remit (Outline
Description N
o
B PRJ.CAP.1269/2023), and no objections thereto have been made by the Steering
Board
within one month of receiving such information.
- that, in accordance with chapter IV of the Council Decision, the EDA
Steering Board endorsed the Outline
Description N
o
B PRJ.CAP.1269/2023 with the Steering Board Decision SB 2023/002 on 21
February
2023 establishing the present CPoA Project as an EDA Ad Hoc Category B project.
- without prejudice to the intention of any interested pMS to request joining
this PA at a later stage in
accordance with the conditions and procedure set forth in Art. 20.4 of the
Council Decision.
PA
N
o
BPRJ.CAP.1269 – CPoA
5
Have reached the following understandings concerning the following Category B
Project entitled:
“Collaborative Procurement of Ammunition”
( “CPoA”)
2. Objective and Scope
2.1. The availability of ammunition, as well as the associated stockpiles, are
recognised by EU Member
States as a critical operational shortfall. This affects the readiness of
Member States' armed forces and their
ability to fulfil their missions.
The overall objective of the Project is to support contributing Members (cMs)
in their efforts to acquire
ammunition.
2.2. The specific objective of the Project is to conduct collaborative
procurement, on behalf of the cMs
and in support of implementation of Council Decisions, of different ammunition
types and calibers with
EDA acting as the contracting authority, management body, and
Ordering Entity (OE). Collaborative
procurement of ammunition can produce significant cost savings. Moreover,
collaborative demands and
procurement can improve the security of the supply chains, optimise delivery
times and facilitate better and
more efficient management of stocks.
2.3. The Project will address the different types of ammunition,
including the components for the
ammunition, such as Tank Ammo, Artillery Ammo, Mortar Ammo, Auto Cannon Ammo,
Small Arms
Ammo, and AnTk Ammo (refer to Annex 4).
3. Participation
This Project Arrangement (PA) is open to EDA’s pMS, as well as to all entities
entitled to take part in
EDA’s ad hoc activities pursuant to Articles 20, 23, 24, and 25 of the Council
Decision.
4. Management and Governance of the PA
The management and implementation of the Project will be achieved by the
following governance structure:
- The Project Arrangement Management Group (PAMG) is the decision-making
authority.
- The Project Working Group (PWG) is the expert group in the field of
technical data concerning the
ammunition and/or related items to be procured under this PA. The PWG is
subordinated to the
PAMG.
PA
N
o
BPRJ.CAP.1269 – CPoA
6
- EDA will act as the contracting authority, management body, and OE.
4.1. Project Arrangement Management Group (PAMG)
The cMs’ representatives are listed in Annex 2 and will constitute the PAMG.
Each cM will have one vote
and one PAMG representative. EDA will be part of the PAMG without any voting
rights. All decisions by
the PAMG will be taken by consensus. Any disputed decision that cannot be
agreed by consensus within
the PAMG, will be resolved in accordance with the provisions of section 8.
The PAMG will be responsible for:
a. providing EDA guidance, support and inputs related to procurement
activities, including the
timelines and sourcing strategy undertaken by EDA under this PA;
b. endorsing the draft procurement documents, including the draft
Framework Agreement (FWA),
before any procurement procedure is launched ;
c. supporting EDA in the execution of this Project, encompassing all
administration and management
issues of common interest, including those related to collaborative procurement
under this PA;
d. harmonising the requirements for the acceptance of supplies taking into
account national standards;
e. deconflicting and/or prioritising, when needed, Written Orders (WO) in
excess of the production
capacity;
f. confirming the Order Form (OF);
g. taking any decision to comply with any applicable provision of this PA;
h. providing support and inputs to EDA in the preparation of possible
amendments to this PA;
i. appointing a Chairperson;
j. providing guidance to the PWG, tasking it and approving its
recommendations;
k. deciding, on a case-by-case basis, about participation of third parties in
PAMG and in the PWG
meetings, following a fifteen working days silence procedure, in accordance
with relevant EDA
rules and procedures;
l. providing guidance to EDA on the implementation of funds to support the
activities under this PA
in the frame of any relevant financial instruments of the European Union (EU),
when in effect. Inter
alia, the following EU financial instruments, may provide additional support to
the activities under
this PA:
- from the General Budget of the EU, for example: European Defence Industry
Reinforcement
through Common Procurement Act (EDIRPA), European Defence Investment
Programme
(EDIP);
- from outside of the General Budget of the EU , for example : the European
Peace Facility (EPF);
PA
N
o
BPRJ.CAP.1269 – CPoA
7
m. approving reports prepared by EDA, if requested by the EDA Steering Board,
on the state-of-play
of this Project;
n. approving a final report prepared by EDA, at the end of this Project, to be
forwarded in written
format to the EDA Steering Board.
The PAMG will act in accordance with the Terms of Reference (ToR) that the PAMG
itself will adopt.
4.2. Project Working Group (PWG)
The PWG will be comprised of representatives of the cMs at technical expert
level with no decision-making
responsibilities. It will be chaired by EDA and will meet whenever necessary,
upon request of any cM or
EDA. The PWG will be responsible for elaborating all relevant and
necessary technical data and
documentation related to the collaborative procurement to be carried out under
this PA.
The PWG will report directly to the PAMG. If requested, EDA will produce the
minutes of each meeting.
Those minutes, including possible recommendations, will be provided to the
PAMG.
5. Role of EDA
In the frame of the present PA, EDA will:
a. carry out the overall coordination, administration, and management of the
Project;
b. coordinate with the cMs to survey their needs and aggregate their
demands, in order to provide
common efficient solution to enable standardisation among cMs;
c. provide market awareness to cMs to facilitate and optimise their access to
production capacity;
d. act as the contracting authority, management body, and OE in the
context of collaborative
procurement procedure(s);
e. prepare the draft procurement documents, including the draft FWA ;
f. before any procurement procedure is launched, provide the PAMG with the
draft procurement
documents, including the draft FWA, for PAMG endorsement;
g. sign, share, and manage the FWAs and the resulting OF(s) in accordance with
the relevant rules and
procedures applicable to the EDA, as complemented by the EU Directive
2009/81/EC;
h. coordinate all associated financial, administrative, and fiscal
formalities, without contradicting the
national laws and regulations of the cMs;
i. manage the funds allocated to the EDA in the frame of this PA in accordance
with Article 17 of the
Council Decision;
PA
N
o
BPRJ.CAP.1269 – CPoA
8
j. contribute to the concept of “security of supply”, insofar as possible,
and ensure predictability
of delivery times. cMs can rely on OFs under FWAs associated with of this PA in
supporting their
own national defence armament activities;
k. assign a dedicated Project Officer (PO) who will be responsible for the
effective coordination of the
Project. The PO will take part in PAMG and PWG meetings, without voting rights;
l. host and arrange meetings of the PAMG and PWG, if requested,
including the preparation of
minutes;
m. support the Project, as requested by the PAMG and the PWG, within means and
capabilities;
n. support PAMG to establish harmonised requirements for the acceptance of
supplies taking into
consideration national standards;
o. receive possible funds, approved by cMs, in the frame of any relevant EU
financial instruments
funded by the General Budget of the EU (e.g., EDIRPA) or outside of it (e.g.,
EPF);
p. set up and manage Collaborative Workspaces (CWS) for this Project, to which
PAMG and PWG
representatives will have access;
q. prepare reports, if requested by the EDA Steering Board, on the
state-of-play of this Project to be
approved by the PAMG;
r. prepare a final report, at the end of this Project to be approved by the
PAMG and forwarded in
written format to the EDA Steering Board.
5.1. Procurement
5.1.1. EDA will act as the contracting authority by tendering,
awarding, signing and managing the
ensuing contractual instruments for the supply of ammunition, in accordance
with EDA’s financial
and procurement rules under Council Decision (EU) 2016/1353 of 4 August 2016 in
accordance with
the provisions of this PA and in compliance with the provisions of Directive
2009/81.
5.1.2. EDA will manage the funding in accordance with section 6 of this PA.
5.1.3. If necessary to support the implementation of Council Decisions, EDA
will place WOs under each
FWA.
5.1.4. Following the launch of the most suitable procurement procedures based
on its financial rules,
EDA will aim at establishing FWAs. Under each FWA, OFs may be placed by EDA
upon receiving
and processing WOs.
5.1.5. This PA and the subsequent FWAs will not entail any financial
commitment from the cM(s). A
financial commitment only occurs, through a specific OF to procure ammunition
on behalf of the
cMs based on WOs.
5.2. Contract Management
PA
N
o
BPRJ.CAP.1269 – CPoA
9
Each cM is entitled to task the EDA to procure a specific ammunition quantity,
up to its forecasted total
amount under the FWA through a WO (Annex 3).
5.2.1. Each FWA will contain relevant data and specifications on the specific
type of ammunition and/or
related items to be ordered and supplied (e.g. lot numbering, quality
assurance, guarantee, packaging
requirements, template of the OF).
5.2.2. When EDA receives or initiates a WO requesting the procurement of
a specific quantity of
ammunition and/or related items, EDA will distribute this information to the
PAMG representatives
in order to pool the demand. An OE may submit additional WOs within a deadline
to be defined on
a case-by-case basis, depending on the underlying urgency of the WOs. EDA will
consolidate all
WOs in a draft OF in due time. When needed, EDA will consult PAMG
representatives of cMs
which have placed a WO and/or are implementing a OF to deconflict and/or
prioritize WOs. The OF
will then be concluded between the EDA and the contractor, according to the
procedure set out in
the respective FWA.
5.2.3. Conditions of participation of cMs to acceptance tests conducted by the
contractor and executed
for OF will be defined in the FWA. Costs implied for the cMs’ participation
will be at their own
expense. Acceptance tests of the delivered items can be performed by each cM at
its own cost and
discretion. If so, this can be specified in the FWA and will be finalised in
the OF.
5.2.4. The supplies will be delivered by the contractor to the receiving cMs
in accordance with the OF
as prescribed in the FWA.
5.2.5. cMs will inform EDA on the good execution and any possible delay of
delivery, production defect
or lack of conformity with the awarded quality of the delivered items. EDA in
the latter cases, in
consultation with each concerned cM, will apply pertinent provisions as set out
in the FWA and
handle possible indemnification proceedings on behalf of the concerned cMs and
in accordance with
agreements in place to support the implementation of Council Decisions.
6. Financial Provisions
6.1. General principles:
6.1.1. Contributions from EU financial instruments:
- Contributions from the General Budget of the EU may be made to this PA in
accordance with Article
22 of Council Decision (CFSP) 2015/1835 of 12 October 2015;
- Contributions from EU financial instruments outside the General Budget of
the EU may be made to
this PA in accordance with Article 25 of Council Decision (CFSP) 2015/1835 of
12 October 2015;
6.1.2. Administrative costs incurred by EDA
PA
N
o
BPRJ.CAP.1269 – CPoA
10
- EDA will not request any administrative cost (fee) from the cMS, either for
the implementation of
this PA, or for the management of the FWAs concluded under it.
- However, EDA may receive a subsidy from Union financial instruments, funded
by the General
Budget of the EU or outside of it.
6.1.3. VAT regime:
All purchases made by EDA under this PA will be subject to the VAT regime in
accordance with the
Council Directive 2006/112/EC of 28 November 2006 on the common system of value
added tax (VAT)
and Article 27.3 of the Council Decision. EDA will regularly inform the PAMG
on VAT.
6.2. Contribution from cMs
6.2.1. Work and any travelling expenses inter alia with other administrative
costs incurred by cMs under
this Project will be borne by the cMs. In case of urgency as ascertained by the
PAMG, willing cMs
may surge EDA's human resources with temporary allocation of experts.
6.2.2. EDA will open and manage an Ad-Hoc Bank Account for the specific
purpose of implementing
this PA.
6.2.3. Payments associated with the implementation of th is PA will be made in
Euros and will be handled
by EDA in accordance with EDA Financial Rules.
6.2.4. The financing mechanism will consist of two steps: pre-financing and
balance payments.
6.2.5. A call for contributions corresponding to the pre-financing and/or
balance payments will be
submitted by EDA to the cMs, after finalising the OF. The cMs will
complete their respective
national approval procedures and make their payments within 60 (sixty)
calendar days after receiving
the call for contribution. This procedure applies for the pre-financing of an
OF for each cM , as well
as the balance payment after the delivery and acceptance of the ordered
supplies. A call for
contributions for pre-financing will include a guarantee for the return of the
pre-financing paid by
the cMs in accordance with the conditions in the pre -financing bank guarantee
that EDA will request
from the contractor.
6.2.6. cMs may provide funds in excess of the prefinancing amount up to the
total amount of their order
and will notify EDA of their intention within 60 (sixty) days, as mentioned in
section 6.2.5.
6.2.7. cMs may have the opportunity to transfer funds not immediately
connected to WOs into the Ad-
Hoc Bank Account.
6.2.8. Throughout the PA, cMs will ensure that they will transfer to the
Ad-Hoc Bank Account sufficient
funds to enable EDA to fulfil its contractual payment obligations to
contractor(s) in a timely manner
or the cMs will formally commit that they will transfer them to EDA before any
related payment
becomes due. Should EDA not have sufficient funds on Ad-Hoc Bank Account, the
contractual
PA
N
o
BPRJ.CAP.1269 – CPoA
11
liability arising from late payments to contractor(s) will be borne by cM(s)
responsible for delayed
payments, as specified under 7.2.
6.2.9. EDA will produce a global financial report within 6 (six) months after
the end of the PA detailing
all funds and invoices received, payments made and indicating the final balance
of the Ad-Hoc Bank
Account. This report will be submitted to the cMs and will be subject to the
audit by the EDA College
of Auditors.
6.2.10. Any unused funds will be returned to the cMs based on their
instructions. Interest generated by
the funds transferred to the Ad -Hoc Bank Account will be shared between the
cMs proportionally to
their respective financial contributions unless the cMs decide otherwise.
6.2.11. In order to facilitate the timely closure of the Ad-Hoc Bank Account,
in the absence of a clear
instruction from the cMs regarding return of their unused funds and of the
related bank interest
within one month after the receipt of the global financial report, EDA will
offset the surplus arising
from this PA against the annual contribution of the cMs to the EDA general
budget.
6.2.12. EDA will close the Ad-Hoc Bank Account, once all the unspent funds have
been reimbursed or
re-allocated as so requested by the respective cMS.
6.2.13. EDA will keep an accounting record in Euros of the commitments and
payments made by each
cM under this PA. EDA will supply the cMs with annual reports on the Ad-Hoc
Bank Account,
showing pre-financing, revenue, expenditure, and commitments made under this
PA. An annual
bank reconciliation will also be provided.
6.2.14. EDA will prepare annual accounts to be signed by EDA ’s Accounting
Officer and audited by the
College of Auditors in accordance with EDA’s Financial Rules. These audit costs
will be paied for
by EDA. At the request of EDA or any of the cMs, who in this case will bear the
cost, the College
of Auditors or its representatives may perform any additional audit to provide
assurance on the sound
financial management and legality and regularity of th is Project.
6.2.15. For all financial matters, the points of contact (PoC) will be:
For the European Defence Agency:
European Defence Agency
Finance Unit
Rue des Drapiers, 17-23
B-1050 BRUSSELS
[email protected]
Tel : +32 (0) 2 504 29 77.
6.3 Union Financial Instruments
PA
N
o
BPRJ.CAP.1269 – CPoA
12
The terms and conditions concerning the use under this PA of funding received
from the EU financial
instruments referred to in paragraph 6.1 above will be set out in separate
legal instruments to be
concluded by EDA and the relevant financing e ntity.
7. Claims and Liabilities
7.1. All claims and liabilities arising from or in connection with the
execution of this PA will be dealt
in accordance with international, European, and national laws and regulations
applicable to the cMs
concerned. EDA’s liability will apply exclusively to the activities listed in
section 5.
7.2. In relation to procurement procedures managed by EDA under this Project,
EDA will define the
appropriate remedies in the tender documents. The contractual liability of EDA
will be covered by the
rules applicable to the contract concerned.
7.3. The cMs will not be jointly and severally liable for EDA's contractual
liability arising due to late
payments from OFs placed on behalf of several cM s. Each cM will be liable for
damages resulting from
delays in payment of its respective contributions to EDA in relation to its WO
as confirmed in the OF.
8. Dispute Settlement
8.1. This PA does not constitute a treaty under international law. Should
international, EU or national
laws and regulations prevent the partial or full implementation of this PA, cMs
will consult each other
to find a solution.
8.2. In case of any conflict between this PA and international, European or
national laws and
regulations applicable to the cMs the latter will prevail. The cMs will notify
each other in the event of
any such conflict.
8.3. Any differences in the interpretation or application of this PA will be
resolved solely by
consultation between the cMs.
8.4. Any dispute between cMs arising out of or in connection with the
implementation of this PA will
exclusively be resolved through consultation, using as criteria the relevant
laws, as identified by the
disputing cMs.
9. Security
9.1. Classified Information exchanged under this PA will be handled and
protected in accordance
with the applicable national laws and regulations, and with existing
security agreements and
arrangements, including Council Decision on the security rules for prote cting
EU classified information
(2013/488/EU).
9.2. The highest level of EU classification of information under this PA and the
ensuing procurement
PA
N
o
BPRJ.CAP.1269 – CPoA
13
and contracts is EU Restricted.
9.3. If needed during the execution of this Project, the PAMG can agree on
a higher level of
classification without requiring an amendment to this PA.
10. Duration, amendment and modification, withdrawal, termination, admission of
new members
10.1. Duration
This PA will remain in effect for a period of 8 (eight) years and will be
renewed tacitly for successive
periods of 8 (eight) years, unless the cMs decide unanimously not to extend its
duration.
10.2. Amendments and modifications
10.2.1. No amendment can be made to this PA in the first 2 (two) months
following its entering into effect.
Subsequently, this PA may be amended at any time in writing by unanimous
decision of all the cMs
for which the PA has become effective.
10.2.2. The modification of the cover page and Annexes does not constitute an
amendment and can be
done at any time following notification in writing by the concerned cMs to EDA.
EDA will notify
the modification to the PAMG for approval.
10.2.3. The inclusion of funds in the PA’s Ad-Hoc budget from EU financial
instruments funded by the
General Budget of the EU or outside of it will not require an amendment to this
PA if used in line
with the PA objectives.
10.3. Withdrawal
10.3.1. A cM can withdraw from this PA by means of a unilateral written
notification sent to EDA. Its
withdrawal will take effect 6 (six) months after the date of the received
notification. All commitments
of the withdrawing cM regarding Liability and Claims (Section 7), Dispute
Settlement (Section 8),
on Security (Section 9), Termination (Section 10.4), Signature and Entry into
Effect (Section 12),
subscribed before the withdrawal date will remain in effect also after
the withdrawal date. The
financial commitments reflected in the OF (and derived from WO) before
withdrawal must be
complied with after withdrawal.
10.3.2. EDA will notify the other cMs to this PA of any changes of membership
to this PA within seven
(7) days from the withdrawal notification.
10.4. Termination
10.4.1. This PA may be terminated at any time by unanimous decision of the cMs.
10.4.2. In case of termination or expiry of this PA, the commitments regarding
Liability and Claims
(Section 7), Dispute Settlement (Section 8), Security (Section 9), Termination
(paragraph 10.4),
Signature and Entry into Effect (Section 12), subscribed during its period of
validity will remain in
PA
N
o
BPRJ.CAP.1269 – CPoA
14
effect after termination or expiration. The financial commitments reflected in
the OF (and derived
from WO) before termination must be complied with after termination.
10.5. Admission of New Members
10.5.1. Any EDA participating pMS and/or any entity entitled to participate in
EDA Ad-Hoc activities
not participating in this PA may, at any time during the period of validity of
this PA, express the
wish to become a member of the Project by means of a unilateral Statement of
Accessi on to the PA.
A template of the Statement of Accession is enclosed as Annex 5.
10.5.2. The new member will be able to join the Project upon admission. Such
admission will entail that:
- The new member(s) wishing to join this Project accept all provision of this
PA;
- the Statement of Accession is addressed in writing to EDA;
- EDA sends receipt notification of the Statement of Accession to PAMG and to
the cMs;
- Each cM will provide its decision in writing about the admission of the new
member to this Project.
Each cM will send its consent or express reservation should the cM detect a
negative impact on this
PA, to the EDA within 2 (two) months of receipt notification following the
relevant Statement of
Accession in accordance with Article 20(4) of the Council Decision (CFSP)
2015/1835.
- The EDA PO will monitor the admission of new members and will issue to the
cMs regular reminders
with a view to complying with the two months deadline.
- EDA will notify the PAMG of the cM decision on the new member’s admission to
the PA. EDA will
update accordingly the list of cMs on the cover page of this PA and will send
the updated version
inclusive certified true copies of the written cMs decisions and of the
Statement of Accession to the
cMs.
11. Special provisions
For the purposes of implementing the Project, cMs will not consider EDA as an
end user under the relevant
national legislation. The end user will be indicated on the OF.
12. Signature and date of entry into effect
12.1. This PA will be signed both in the English and French languages, each
version being equally valid.
12.2. The originals will be held by EDA, with one certified true copy being
sent to each cM.
12.3. This PA will come into effect upon the date of the signature of a
minimum of three (3) cMs and
EDA. For those cMs signing after this date, the PA will come into effect on the
date of their signature.
PA
N
o
BPRJ.CAP.1269 – CPoA
15
For the FEDERAL MINISTER OF DEFENCE OF THE REPUBLIC OF AUSTRIA
Signature
..........................................................................................................
Place ..................................................................................................
Date
PA
N
o
BPRJ.CAP.1269 – CPoA
16
For the MINISTER OF DEFENCE OF THE KINGDOM OF BELGIUM
Signature ..........................................................................................................
Place
..................................................................................................
Date
PA
N
o
BPRJ.CAP.1269 – CPoA
17
For the MINISTRY OF DEFENCE OF THE REPUBLIC OF BULGARIA
Signature
..........................................................................................................
Place ..................................................................................................
Date
PA
N
o
BPRJ.CAP.1269 – CPoA
18
For the MINISTRY OF DEFENCE OF THE REPUBLIC OF CROATIA
Signature ..........................................................................................................
Place
..................................................................................................
Date
PA
N
o
BPRJ.CAP.1269 – CPoA
19
For the MINISTRY OF DEFENCE OF THE REPUBLIC OF CYPRUS
Signature
..........................................................................................................
Place ..................................................................................................
Date
PA
N
o
BPRJ.CAP.1269 – CPoA
20
For the MINISTRY OF DEFENCE OF THE CZECH REPUBLIC
Signature ..........................................................................................................
Place
..................................................................................................
Date
PA
N
o
BPRJ.CAP.1269 – CPoA
21
For the MINISTRY OF DEFENCE OF ESTONIA
Signature
..........................................................................................................
Place ..................................................................................................
Date
PA
N
o
BPRJ.CAP.1269 – CPoA
22
For the MINISTRY OF DEFENCE OF THE REPUBLIC OF FINLAND
Signature ..........................................................................................................
Place
..................................................................................................
Date
PA
N
o
BPRJ.CAP.1269 – CPoA
23
For the MINISTER FOR THE ARMED FORCES OF THE FRENCH REPUBLIC
Signature
..........................................................................................................
Place ..................................................................................................
Date
PA
N
o
BPRJ.CAP.1269 – CPoA
24
For the FEDERAL MINISTRY OF DEFENCE OF THE FEDERAL REPUBLIC OF GERMANY
Signature ..........................................................................................................
Place
..................................................................................................
Date
For the MINISTRY OF NATIONAL DEFENCE OF THE HELLENIC REPUBLIC
PA
N
o
BPRJ.CAP.1269 – CPoA
25
Signature
..........................................................................................................
Place
..................................................................................................
Date
PA
N
o
BPRJ.CAP.1269 – CPoA
26
For the MINISTER OF DEFENCE OF HUNGARY
Signature
..........................................................................................................
Place
..................................................................................................
Date
PA
N
o
BPRJ.CAP.1269 – CPoA
27
For the MINISTER FOR DEFENCE IRELAND
Signature
..........................................................................................................
Place ..................................................................................................
Date
PA
N
o
BPRJ.CAP.1269 – CPoA
28
For the MINISTRY OF DEFENCE OF THE ITALIAN REPUBLIC
Signature ..........................................................................................................
Place
..................................................................................................
Date
PA
N
o
BPRJ.CAP.1269 – CPoA
29
For the MINISTRY OF DEFENCE OF THE REPUBLIC OF LATVIA
Signature
..........................................................................................................
Place ..................................................................................................
Date
PA
N
o
BPRJ.CAP.1269 – CPoA
30
For the MINISTRY OF DEFENCE OF THE REPUBLIC OF LITHUANIA
Signature
..........................................................................................................
Place
..................................................................................................
Date
PA N
o
BPRJ.CAP.1269 – CPoA
31
For the THE MINISTER OF DEFENCE OF THE GRAND DUCHY OF LUXEMBOURG
Signature
..........................................................................................................
Place
..................................................................................................
Date
PA
N
o
BPRJ.CAP.1269 – CPoA
32
PERMANENT SECRETARY
OFFICE OF THE PERMANENT SECRETARY
For the MINISTER RESPONSIBLE FOR DEFENCE OF THE REPUBLIC OF MALTA
Signature
..........................................................................................................
Place ..................................................................................................
Date
PA
N
o
BPRJ.CAP.1269 – CPoA
33
For the MINISTER OF DEFENCE OF THE KINGDOM OF THE NETHERLANDS
Signature ..........................................................................................................
Place
..................................................................................................
Date
PA
N
o
BPRJ.CAP.1269 – CPoA
34
For the MINISTRY OF DEFENCE IN NORWAY
Signature
..........................................................................................................
Place ..................................................................................................
Date
PA
N
o
BPRJ.CAP.1269 – CPoA
35
For the THE MINISTER OF NATIONAL DEFENCE OF THE REPUBLIC OF POLAND
Signature ..........................................................................................................
Place
..................................................................................................
Date
PA
N
o
BPRJ.CAP.1269 – CPoA
36
For the MINISTRY OF NATIONAL DEFENCE OF THE PORTUGUESE REPUBLIC
Signature
..........................................................................................................
Place ..................................................................................................
Date
PA
N
o
BPRJ.CAP.1269 – CPoA
37
For the MINISTRY OF NATIONAL DEFENCE OF ROMANIA
Signature ..........................................................................................................
Place
..................................................................................................
Date
PA
N
o
BPRJ.CAP.1269 – CPoA
38
For the MINISTRY OF DEFENCE OF THE SLOVAK REPUBLIC
Signature
..........................................................................................................
Place ..................................................................................................
Date
PA
N
o
BPRJ.CAP.1269 – CPoA
39
For the MINISTER OF DEFENCE OF THE REPUBLIC OF SLOVENIA
Signature ..........................................................................................................
Place
..................................................................................................
Date
PA
N
o
BPRJ.CAP.1269 – CPoA
40
For the MINISTER OF DEFENCE OF THE KINGDOM OF SPAIN
Signature
..........................................................................................................
Place ..................................................................................................
Date
PA
N
o
BPRJ.CAP.1269 – CPoA
41
For the FÖRSVARETS MATERIELVERK OF THE KINGDOM OF SWEDEN
Signature ..........................................................................................................
Place
..................................................................................................
Date
PA
N
o
BPRJ.CAP.1269 – CPoA
42
The European Defence Agency
Signature
..........................................................................................................
Place ..................................................................................................
Date
PA
N
o
BPRJ.CAP.1269 – CPoA
43
ANNEX 1
Principal organisations
The principal organisations in charge of the execution of the Project are as
follows:
cMs Principal organisations
Austrian Cm
Bundesministerium für Landesverteidigung
Generaldirektion für Landesverteidigung
Abteilung Rüstungsplanung
Rossauer Lände 1
A - 1090 Wien
Belgian cM
The Minister of Defence of the Kingdom of Belgium
Public Market Division
Bulgarian cM
Croatian cM
Ministry of Defence of the Republic of Croatia
Material Resources Directorate
Cypriot cM
Ministry of Defence of the Republic of Cyprus
Czech cM
Ministry of Defence of the Czech Republic
Armaments and Acquisition Division
Finnish cM
Finnish Defence Force Logistics Command
French cM
German cM
Federal Ministry of Defence
A III 2 – Land Combat Systems
P.O. Box 13 28
53003 Bonn
Germany
Mail: [email protected]
Greek cM
PA
N
o
BPRJ.CAP.1269 – CPoA
44
Hungarian cM
Irish cM
The Department of Defence Ireland
Station Road
Newbridge
Co Kildare
Republic of Ireland
Italian cM
Latvian cM
Lithuanian cM
Luxemburguese cM
Maltese cM
HQ Armed Forces of Malta
Luqa Barracks
Luqa – VLT 2000
Dutch cM
Norwegian cM
Norwegian Defence Material Agency (FMA)
Grev Wedels plass 1
0151 Oslo
Norway
[email protected]
Polish cM
Armament Agency
Krolewska 1/7, 00-909 Warsaw, Poland
e-mail: [email protected]
Portuguese cM
Romanian cM
General Directorate for Armaments
Slovakian cM
Slovenian cM Ministry of defence of Republic of Slovenia
Vojkova 55, 1000 Ljubljana, Slovenia
PA
N
o
BPRJ.CAP.1269 – CPoA
45
Spanish cM
Swedish cM
PA
N
o
BPRJ.CAP.1269 – CPoA
46
ANNEX 2
PAMG MEMBERSHIP
cMs PAMG representatives
Name of cM Name, address, contact data
Austrian cM Representative:
ObstdG Markus KOHLWEG
Ltr MVB/Rüst
[email protected]
Abteilung Rüstungsplanung
Rossauer Lände 1
A - 1090 Wien
Belgian cM Representative:
Maj (OF-3) MAB GORA Pascal
[email protected]
+32 (0)2 44 16 108
MRMP-L/A
Quartier Reine Elisabeth – bloc 4 (box 29)
Rue d’Evere, 2
B-1140 Brussels
Bulgarian cM Representative:
Croatian cM Representative:
Colonel Đuro Pažin
[email protected]
Head of Ammunition and CBRN Protection
Equipment Division
Acquisition and Modernization Department/Material
Resources Directorate Ministry of Defence of the
Republic of Croatia
Cypriot cM Representative:
Major SOCRATOUS Socrates
Ministry of Defence
Strovolou Avenue 172-174, 2048 Nicosia
Cyprus
[email protected]
PA
N
o
BPRJ.CAP.1269 – CPoA
47
Czech cM Representative:
Katerina Lisanikova
[email protected]
Armaments Cooperation Unit
Armaments and Acquisition Division
Ministry of Defence of the Czech Republic
náměstí Svobody 471/4, 160 01, Prague 6
Finnish cM Representative:
Mr Jesper Eklund
Finnish Logistic Command
+358299570378
[email protected]
French cM Representative:
German cM Representative:
Greek cM Representative:
PA
N
o
BPRJ.CAP.1269 – CPoA
48
Hungarian cM Representative:
Irish cM Representative:
Brendan Fitzgerald
e-mail: [email protected],
Address: Station Road, Newbridge, Co.Kildare, W12
AD93
Italian cM Representative:
Latvian cM Representative:
Lithuanian cM Representative:
Luxemburguese Representative:
Maltese cM Representative:
Keith Mizzi
Integrated Logistics Branch
HQ Armed Forces of Malta
Luqa Barracks Luqa
VLT [email protected]
Dutch cM Representative:
Norwegian cM
Representative:
Martin Blom
Norwegian mission to the EU
[email protected]
Polish cM Representative:
Grzegorz Borysewicz
Permanent Representation of the Republic of
Poland to the European Union
Rue Stevin 139, 1000 Brussels, Belgium
[email protected]
Grzegorz Borysewicz
Permanent Representation of the Republic of
Poland to the European Union
Rue Stevin 139, 1000 Brussels, Belgium
PA
N
o
BPRJ.CAP.1269 – CPoA
49
[email protected]
Portuguese cM Representative:
Romanian cM Representative:
Gabriel DIACONESCU
[email protected],
+40722596999
Slovakian cM Representative:
Slovenian cM Representative:
Mr Uroš Korošec,
Address: Vojkova 55, 1000 Ljubljana, Slovenia
e-mail: [email protected]
Spanish cM Representative:
Swedish cM Representative:
EDA
Constantin CIOCIRLAN
European Defence Agency
Rue des Drapiers 17-23
1050 Brussels
Belgium
Email: [email protected]
PA
N
o
BPRJ.CAP.1269 – CPoA
ANNEX 3
[ Template]
Written Order (WO)
in the framework of the Project Arrangement N
o
B.PRJ.CAP.1269 and
Framework Agreement No. ……… signed between EDA and …….. [contractor name]
Subject: Ordering ammunition pursuant to Section 5 of the Project Arrangement
N
o
B.PRJ.CAP.1269
Ordering Entity (OE): ……………..(full name)
(Where applicable) cM principal organization: ………………… (full name, e.g. Ministry
of
Defence, Land Forces, Department of Acquistion)
Requesting Ordering Entity’s order reference number……………………
(Where applicable) Contribution Agreement for Union financial instruments
reference
number.......
(Where applicable) To: European Defence Agency (EDA)
The following quantity of ammunition must be ordered under this WO: …[AA]…..
[Total]
as depicted below:
Ammunition
Name Type NATO Stock
Number (NSN)
Quantity
(rounds)
Level 1 Level 2 Level 3 Name & abbreviation
[Anti Tank
Ammunition]
[ recoiless
rifle
grenade]
[Carl
Gustav 84
mm]
[High
Explosive]
[HE] [1315-17-042-149] [150]
[Training
Practice
Round]
[TPR]
Total [AA]
Place of ammunition delivery: …………[cM name], ……. …………..[depot postal address]
……………. [name]
….. [stamp]
……………..
[Rank, name and signature of the entitle
person]
PA
N
o
BPRJ.CAP.1269 – CPoA
51
Date: ……………………………
PA
N
o
BPRJ.CAP.1269 – CPoA
52
ANNEX 4
MAIN CATEGORY
SUBCATEGORY –
LEVEL 1
SUBCAT. – LEVEL
2
SUBCAT.
LEVEL 3
AMMUNITIONS TA – Tank Ammo 120 mm
AMMUNITIONS AA – Artillery Ammo AA 155 mm
ROUNDS
CHARGES
FUZES
PRIMERS
AMMUNITIONS MA – Mortar Ammo
MA 60 mm
MA 81 mm
MA 120 mm
AMMUNITIONS ACA – Auto Cannon Ammo
ACA 25 mm
ACA 30 mm
ACA 35 mm
ACA 40 mm
AMMUNITIONS SAA – Small Arms Ammo
SAA 5.56 mm
SAA 7.62 mm
SAA 8.6 mm
SAA 9 mm
SAA 12.7 mm
ANTI-TANK AMMUNITIONS ATAM – Anti-Tank Ammo
Recoiless Rifle Ammo Various types
RPGs Ammo
PA
N
o
BPRJ.CAP.1269 – CPoA
53
ANNEX 5
Statement of Accession for the admission of a new cM
Defined terms in this statement have the same meaning as in the
Project Arrangement
N
o
B.PRJ.CAP.1269
The Republic/ Kingdom/ Government/ Ministry /Minister of
________________________
Represented
By________________________________________________
INTENDS TO:
- participate as per para. 10.5 of this PA to new or running “CPoA”-Projects or
activities;
- accept the provisions of this PA;
- contribute to new or running “CPoA”-Projects or activities.
Principle-organisation as per Annex 1 will be:
cM Principal organisations
cM name Name in full and address
For the Republic/ Kingdom/ Government/ Ministry / Minister of
___________________________
Date: ___________________